|
|
Home » News » industry information » Frequency converter regular maintenance (4)

Frequency converter regular maintenance (4)

Views: 4     Author: Site Editor     Publish Time: 2018-02-08      Origin: Site

After dedusting of circuit board and bus bar, necessary anticorrosion treatment is carried out, insulating paint is painted, and burr must be removed after partial discharge and arc pulling are used. The damaged part of the insulating board which has been insulated and broken shall be removed, the insulation board of the corresponding insulation grade shall be isolated from it near the damage, and the insulation shall be fastened and tested and considered qualified before being put into use.


Links

Contact Us

> Tel:86-562-2821018
> Fax:86-562-2821558
> Mob:86-13305620368
> Email:mpp@film-capacitor.com
> Address:NO.1771 QiFeng Road, Shizishan Economic Development Zone,Tongling, Anhui, China
Copyright  2017 Anhui Safe Electronics Co., LTD. All rights reserved. Sitemap      Log in to my mailbox